RUNONRESERVE FIELD NOTES
A practical guide to outage planning
Start with what you need to protect: safe food storage, communication, lighting and essential equipment. A smaller, deliberate load list can stretch a battery much further than trying to power an entire home.
Build a realistic essentials list
Follow the focused guides for measuring appliance energy, solar recharge and generator and hybrid backup. Each connects directly to the relevant planning controls.
List every device, including the modem, optical network terminal and chargers that are easy to overlook. Separate equipment that needs continuous service from equipment you can use briefly or defer. The appliance load calculator includes editable generic starting points.
Measure energy, then check starting power
For suitable plug-in appliances, an appropriately rated energy meter can record watt-hours over a representative day. Divide daily Wh by running watts to estimate equivalent operating hours. Do not reduce both hours and duty cycle for the same cycling effect. Read the manufacturer’s instructions before using any meter.
Do not treat a microwave’s cooking output as its electrical input. A charger’s maximum rating is not necessarily its average consumption. Motors can demand substantially more power at startup; confirm actual startup specifications and duration.
Read the battery specifications carefully
Wh describes stored energy. W describes power delivered at one moment. Check continuous and surge output separately, including per-outlet and total limits. Confirm usable capacity and whether a published capacity is nominal DC energy or already-delivered AC energy. Our input expects nominal battery Wh; using an AC-delivered figure with conversion losses again understates runtime.
Connect equipment safely
- Never run a fuel-burning generator in a home, garage, basement or enclosed space. Keep it outdoors at least 20 feet from windows, doors and vents, with exhaust directed away. Use working CO alarms. Follow CDC carbon monoxide guidance and manufacturer instructions.
- Never backfeed a wall outlet. Home circuits need suitable transfer or isolation equipment selected and installed by a qualified electrician under local requirements.
- Hardwired HVAC and well pumps need review of voltage, starting current, grounding, bonding and neutral configuration. A larger battery alone does not establish compatibility.
- Confirm 120 V versus 240 V, AC versus DC, connector polarity, approved extension cords, operating temperature and manufacturer restrictions. Keep batteries and electrical connections dry.
- For medical and accessibility equipment, ask the manufacturer and care team about approved backup equipment and an independent contingency plan. This calculator cannot guarantee runtime, waveform compatibility or continuity of care.
Revisit the plan before an outage
Charge the system, keep manuals available and test only in a safe manufacturer-approved setup. Adjust for battery aging, cold conditions, storm-driven pump usage and changing needs. Save a modest plan and a higher-demand alternative, and export both as backups.
Build your power plan